OPEN TONNAGE JUNE 29TH 2022

*M/V. PC, OPEN: KOHSICHANG 1st JULY
DWT: 61000, CRANE 4 X 30MT AND 4 X 12CBM
61000
*M/V. GW, OPEN: S. CHINA ARD MID AUG
DWT: 50327 MT, CRANES: 4*30MT
50327
*M/V. RO, OPEN HAI PHONG,  3-6 JULY
DWT: 47305, CRANES: 4*30T
47305
*MV.DF, OPEN: THAILAND END OF JUNE
DWT: 46223MT, CRANES: 30MT*4
46223
*M/V. JL, OPEN HAIKOU, S.CHINA, ABT 7TH JULY
 DWT 38852 MT, CRANE: 25TX4
38852
*M/V. AH, DUNG QUAT, VIETNAM O/A 12-15TH, JUL 
DWT 37,405 MT, CRANES: 30MT X 4 SETS 
37405
*M/V. OM; OPEN: MANILA, PHILIPPINES; 28/JUN-2/JUL
DWT: 32376 MT; CRANE: 4*30MT
32376
*M/V. VT, OPEN: HAI PHONG, VN O/A 1ST AUG, DWT: 30600 30600
*M/V TB OPEN: HẢI PHÒNG(DRY DOCK) 1-5/JULY
 DWT   28701 MT, CRANE: 4X30MT (3 CRANE can work simultaneously)
28701
*M/V. ES; OPEN:  PRACHUAP, THAI 3-JUL
DWCC: 28500, GEARS: 4*25MT
28500
*M/V. ES, OPEN: THAILAND 3/JUL
DWT: 28500, CRANES: 4*25MT
28500
*M/V TB, OPEN: HO CHI MINH; REVERTING
DWT: 24838MT; CRANE: 3X25T
24838
*M/V. AG, OPEN ILOILO, PHILIPPINES O/A 17TH AUG, DWG:23700 23700
*M/V. BM, OPEN: HO CHI MINH 26 JULY, DWT: 23641 23641
*M/V. VO, OPEN: BATAAN, PHILS 3-6 JULY
DWT: 23500, CRANES: 4*28MT
23500
*M/V. HO, OPEN BANGKOK, THAILAND       OA      10-15TH/JULY 22700
*M/V: MG, OPEN: HCM, VIỆT NAM, 5-10/JULY/2022, DWT: 22019MT 22019
*M/V. ES, OPEN: KOSICHANG 06TH JUL
DWT: 18500, CRANES: 4*25MT
18500
*M/V. EJ; OPEN: KSC, THAI 05-JUL, DWCC 18000MT 18000
*M/V SS, OPEN: KSC, TH  29TH JUNE, DWT: 13278 13278
*MV RH;  OPEN S.CHINA 11-13/JULY
DWT 13030 MT CRANES 30MT*2 (COMBINE 60MT)
13030
*M/V SS, OPEN: MANILA, PH 5TH JULY
DWT: 12616, CRANES: 30T*2
12616
*MV: YO; OPEN: PHU MY, VN 4TH/JULY/2022, DWCC: 12500MT 12500
*M/V.SG, OPEN: PHUMY MID JUL, DWT: 12217MT 12217
*M/V. OQ, OPEN: PHILS 5-AUG
 DWCC 12000, CRANES: 20MT*4
12000
*M/V.SS, OPEN: MANILA,PHI 5-July, DWT: 11500 11500
*M/V. XS, OPEN: BANGKOK, THAI. O/A: 2ND JUNE
DWT: 11224, CRANES 12T*2
11224
*M/V. SF, OPEN: SIAM SEAPORT 8TH JUL, DWT 10514MT 10514
*M/V.DP, OPEN: BANGKOK, 8th JULY
CRANES: 2*30.7MT, DWT: 10463
10463
*M/V.OS, OPEN: HAIPHONG, VIETNAM, 18-20JUL, DWT: 1030 10298
*M/V:OL; OPEN: MANILA,PHILIPPINES 07 JUL 10245
*M/V.TF, OPEN: MANILA PHILS, END OF JUNE
DWT: 8936 , CRANES: 30MT*2(28M)
8936
*M/V.BM, OPEN: MYTHOI 08 JULY, DWT: 8700 8700
*M/V. AP, OPEN: SANGI PHILS, 4TH JULY
DWT: 8631 CRANES: 30MT*2(28M)
8631
*M/V. AD, OPEN: SANGI PHILS, 16TH JULY
DWT: 8631, CRANES: 30MT*2(28M)
8631
*M/V.QY, OPEN: RIO TUBA PHILS, MID OF JULY
DWT: 8631, CRANES: 30MT*2(28M)
8631
*M/V.AC, OPEN: GS PHILS, 25TH JULY
DWT: 8499, CRANES: 30MT*2
8499
*M/V. LU,  OPEN  HAIPHONG,VIETNAM  4-5TH JULY,2022
DWT: 8397, CRANES: 2*30T
8397
*M/V. CH, OPEN: BANGKOK, THAI 10thAUG
DWT: 8394, CRANES: 2*30T
8394
*M/V. PA, open Hon Gai, 4-5 July, DWT: 8200 8200
*MV SW, OPEN: HAI PHONG, VIET NAM, 18TH/AUG, DWCC: 8000 MT 8000
*M/V. SL, OPEN: HAI PHONG, VN 4TH JUL, DWCC: 8000 8000
DWCC 8000 OPEN HAIPHONG 04TH/JUL MOC 8000
*MV: PA; OPEN: FANGCHENG, 9th JULY DWCC: 7800 MT 7800
*M/V: HD, OPEN: BACOLOD, PHIL; O/A 10-15JULY
DWT: 7346MT; CRANE: 3*10MT
7346
*M/V. AA, OPEN SUBIC, PHILIPPINES, O/A 3RD AUG, DWT: 7200 7200
*M/V DT; OPEN: QUANG NINH; 30 JUNE; DWT: 7080MT 7080
*M/V. EP, OPEN: HCM, VIET NAM. 25-JUL, DWCC: 7000, GEAR: 20MT*3 7000
*M/V ES; BACOLOD, PHILS; 11TH JULY
DWT: 6612MT DRAFT ON 6585M (SUMMER); CRANES: 15MTX2
6612
*M/V LY; OPEN: S.CN; 10 -JUL; DWCC: 6600; GEARS: 20MTX4 6600
*M/V. QM, OPEN BACOLOD , PHILIPPINES  O/A 10 JULY 2022, DWCC: 6600 6600
*M/V. VD; OPEN: KOHSICHANG, THAI ON 29 -02ND JULY, DWT: 6595.8 6595.8
*MV. PN OPEN PHU MY, VIETNAM 3rd JULY 2022
DWT: 6544MT, DERRICKS; 4X15TONS
6544
*M/V. EP, OPEN: KSC THAILAND, END OF JUNE, DWT: 6542, CRANES: 30T*3 6542
*M/V EW; POSITION: QUI NHON; 07th JULY, DWT: 6523MT 6523
*M/V.EC, OPEN: MY THO - VIET, MID OF AUG
DWT: 6438, CRANES: 30*2
6438
*M/V.SA, OPEN: HO CHI MINH END OF JULY, DWT 6205 6205
*M/V ES; OPEN: DAVAO, PHILIPPINES ; 2-JUL; DWCC: 6100 MT, GEARS: 15MT*4 6100
*M/V. ES; OPEN: HCM 20th JULY; DWCC: 6100MT 6100
*M/V PN; OPEN: PHU MY, VIET NAM; 3rd JULY 2022
DWCC: 6100 MT; DERRICKS: 4*15TONS
6100
*M/V. EW, OPEN MANILA, PHIL 13 JUL
 DWCC: 6100, CRANES: 20MT*4
6100
*M/V.RO; OPEN: BACOLOD-PHILIPPINES 6-10 JULY
DWT: 5617.5 MT, WOE / 02 CRANES X 05T
5617.5
*M/V CR, OPEN: VUNG ANG, 11thJUL, DWT: 5380MT 5380
*M/V. HT, OPEN IN CAGAYAN DE ORO, PHILS  MID OF JULY, DWT: 5341 5341
*MV GH, OPEN: ILIGAN, PHILIPIN, 1-5TH/JULY/2022 DWT:5262MT 5262
*M/V. MC, OPEN: DA VAO END JULY, DWT: 5250 5250
*MV: HD; OPEN: HAI PHONG, VN, 5-10th JULY, DWT: 5239.8MT 5239.8
*MV FL, OPEN TAICHUNG 8th JULY, DWT 5230MT 5230
*M/V.HT, OPEN HAI PHONG, VIET NAM ON 20-25 JULY, DWT: 5222 5222
*M/V. PA, OPEN HAI PHONG EARLY JULY
DWT: 5200 MT; 02 CRANE
5200
*M/V.VI, OPEN: DA NANG AREA MID JULY, DWT: 5190.1 5190.1
 *M/V. AH, BANGKOK MID JULY, DWT: 5175.5 5175.5
*M/V HB, OPEN: PHIL 10-12 JULY, DWT: 5142.6 5142.6
*M/V. HA, OPEN: HCM, VIETNAM ON 3-8/8
 DWT: 5142.4 WOE / 2 DERRICKS X 5 MT
5142.4
*M/V: HD, OPEN: CEBU, PHIL ON 7-12thJULY, DWT: 5098,6MT 5098.6
*M/V.HH, OPEN: HOCHIMINH 30TH JUNE 2022
DWT: 5021, CRANE: GEARLESS
5021
*M/V VI, OPEN: DA NANG AREA MID JULY 5000
*M/V: AH, OPEN: HCM EARLY JULY
 DWT: 5175.5MT, 02 DERRICKS x 5 MT
5000
*M/V.RE, OPEN: PHIL Beg of July, DWT: 4890 4890
*MV GH, OPEN TABACO, PHILIPIN, 1-5TH/JULY/2022 DWT: 4738MT 4738
*MV GH, OPEN; ILOILO, PHILIPIN, 15-20TH/JULY/2022 DWT: 4738MT 4738
*M/V. QM, OPEN SUBIC , PHILIPPINES O/A 10 JULY 2022, DWCC: 4200 4200
*M/V. QM, OPEN HCMC, VIETNAM  O/A 01 AUG 2022, DWCC: 4200 4200
*M/V. GL, OPEN: CDO 8-10/7
 DWCC: 3900MT, CRANES 2*5MTS
3900
*MV: DC, OPEN: HẢI PHÒNG, 3rd JULY DWCC: 3850MT 3850
*M/V.PD, OPEN HAI PHONG , VIET NAM 20-25 JULY , DWT: 3162 3844
*M/V. HT, OPEN QUY NHON, VIET NAM  ON 20-25 JULY, DWT: 3683 3683
*M/V. PD, OPEN LONG AN, VIET NAM ON 22-25JULY, DWT: 3668 3668
*M/V.PD, OPEN HAI PHONG , VIET NAM 20-25 JULY , DWT: 3162 3162
*M/V. PA, OPEN LONG AN OR QUY NHON EARLY OF AUG, DWT: 3068 3068

  Ý kiến bạn đọc

Skype
Facebook
Zalo
LIÊN HỆ
Bạn đã không sử dụng Site, Bấm vào đây để duy trì trạng thái đăng nhập. Thời gian chờ: 60 giây